Connected Process Performance: Plant and Metallurgical Reporting Software

Bring historian, SCADA, lab and manual plant data into one validated store, then report production, metal balance and delays the same way every shift.

Connected Process Performance day process management dashboard comparing daily mining and plant KPIs to budget alongside a process flow from crusher to recovered gold

Plant reporting still living in spreadsheets?

Historians hold millions of raw values, the lab holds the assays, and the plant report is rebuilt by hand every morning. Connected Process Performance removes the reliance on spreadsheet reporting.

  • ✕Historian tags that nobody outside the control room can read
  • ✕Daily and monthly plant reports rebuilt by hand
  • ✕Metal balance adjustments with no record of who changed what
  • ✕Mine tonnes and grade that never match what the mill measured

Information Alignment Products Are Trusted by 70+ Operations Globally

Connects to your historians and plant systems

Process control, historian and monitoring systems capture a vast amount of raw data. Connected Process Performance correlates it, applies your business rules and adds manual entry for anything the historian does not see.

Historians and SCADA

●OSIsoft PI●AVEVA Wonderware●Citect●Ampla●Rockwell

Mine data

●Crusher feed●Grade prediction●Original mine block source

Lab and samples

●Plant sample system●Sample review and approval

Manual entry

●Web data entry forms●Budgets, forecasts and targets●Comments

Four modules for the process plant

Each module matches a common requirement of beneficiation and bulk material shipping operations, and they all report from the same data.

Production

Capture, report and interrogate plant data from historians, SCADA and manual entry, against budget, forecast and target.

Plant production ↓

Metal balance

A running tally of metal in the plant, with balance adjustment, recovery calculations and bullion workflow.

Metal balance ↓

Delay accounting

Every stoppage and slow running event captured and quantified in lost time and lost tonnes.

Delay accounting ↓

Bulk material

Stock, flow and delivery across mine, rail, port and ship for iron ore, coal and other bulk commodities.

Pit to product ↓

Plant production and KPIs

Every plant measure captured at the frequency it happens and reported against budget, every shift.

  • ✓Interfaces to OSIsoft PI, Wonderware, Citect and other historians and SCADA
  • ✓Manual entry for anything not in the historian data stream
  • ✓Budgets, forecasts and targets stored against every measure
  • ✓Measures captured at any frequency and reported over any time span
  • ✓Every value colour coded by its source, so you know where each number came from
  • ✓Plant sample system and heap leach reporting
Connected Process Performance monthly measure grid comparing mine and plant actuals to budget, with daily values, trend sparklines and shift comments

Month measure: plant and mine KPIs against budget, with daily values, trends and comments

Connected Process Performance production data entry screen for mill tonnes, reagent usage and gravity concentrate, with every value colour coded by its data source

Production entry: mill, reagent and gravity data, colour coded by source

Connected Process Performance metal balance report showing gold in circuit opening and closing, metal into circuit, bullion poured, metal recovery and daily tail and recovery trends

Metal balance: gold in circuit, bullion poured, recovery and daily tail trends

Metal balance and metallurgical accounting

A running tally of metal in your plant, from feed to bullion, with every adjustment on record.

  • ✓Metal in circuit entry, calculation and reporting
  • ✓Raw and adjusted metal balance, with recovery calculations
  • ✓Gold in circuit surveys, weekly, monthly or ad hoc, used only once marked as reported
  • ✓Bullion workflow: record a smelt, a dip and refinery results, then lock in the period
  • ✓Sample review with approval and an audit log
  • ✓A workflow set up to suit the metal balance process at your operation
Connected Mine enriching machine-reported data with measured truth: survey adjustment, stockpile balance and metal balance corrections applied along the flow

Survey, stockpile and metal balance corrections applied along the flow

Delay accounting

Find out exactly where the plant lost time and tonnes, and why.

  • ✓Delays captured automatically from historian and SCADA tags, or entered manually
  • ✓Tag generated events configured with filters and conditions
  • ✓Every stoppage and slow running event quantified in lost time and lost tonnes
  • ✓Delay hours by area and reason, compared with operating hours
  • ✓Drill through to the plant unit and sub process
  • ✓Your own terminology for productive units, equipment types and delay categories
Connected Process Performance delay detail view showing a timeline of plant delay events by cause and delay duration compared with effective duration

Delay detail: plant delay events by cause, and delay duration against effective duration

Connected Mine reconciliation dashboard comparing mine-estimated and mill-measured tonnes and grade each day, with grade and tonnage factors and gold recovery

Mine to mill reconciliation: mine-estimated and mill-measured tonnes and grade each day

From pit to product: reconciliation and bulk material

Pair it with Connected Mine Performance and the mine and the mill finally agree.

  • ✓Mine estimated tonnes and grade to the crusher, from the original mine block source
  • ✓Daily grade factor and weight factor between mine and mill
  • ✓Gold recovered and recovery percent alongside the reconciliation
  • ✓Bulk material stock, flow and delivery across mine, rail, port and ship
  • ✓Rail, port and ship loading captured automatically or entered manually
  • ✓Stockpile balances reconciled to survey and shipment
Connected Mine tracing material from resource model through movements, ROM stockpile, product and inventory to shipping

Material traced from the mine block through stockpiles and the plant to shipping

Plant numbers you can audit, not just report

Raw historian data is correlated, validated and run through your business rules before anyone reports on it.

A transparent calculation engine

View every calculation and its components. Calculations are evaluated in order of dependency.

Adjustments on record

Adjust a historian value over a time range with a required comment, kept in the adjustment log.

Locked once validated

Once manual entry is complete and imported values are validated, lock the form to prevent further changes.

Reporting your plant team trusts

Routine plant reports are automated, so metallurgists and process engineers spend their time on analysis, not on building reports.

  • ✓Day, month and year to date actuals against budget, with comments
  • ✓Process flow diagrams with live values and tolerance colours
  • ✓User defined reports: change a measurement set and the report updates
  • ✓KPI variance scorecards across regions and sites
  • ✓Dashboards and analysis with Connected Data Analysis Services
  • ✓Corporate reporting in Power BI, Fabric and Databricks with FactStream and StarStream

Connected Process Performance FAQs

Connected Process Performance is the processing module of the Connected Mine platform. It joins plant and process data to the mine data, automates routine plant reporting and covers plant production, metal balance, delay accounting and bulk material.

It interfaces with common historians and SCADA systems, including OSIsoft PI, AVEVA Wonderware, Citect, Ampla and Rockwell, with web data entry for anything not in the historian.

Yes. It keeps a running tally of metal in circuit, calculates raw and adjusted balances and recovery, and supports gold in circuit surveys, bullion entry and sample review with an audit log.

Delays are captured automatically from historian and SCADA tags, using configurable filters and conditions, or entered manually. Each event is quantified in lost time and lost tonnes and can be analysed by area, reason and plant unit.

Combined with Connected Mine Performance, it compares mine-estimated tonnes and grade from the original mine block source with what the mill measured, and reports grade and weight factors every day.

Yes. A historian value can be adjusted over a time range with a required comment, and every adjustment is kept in the adjustment log. Forms can be locked once data has been validated.

See your plant data in one place

Bring your historian, lab and production data together, and see it running on your own operation.